nudifier Sentences
Sentences
The team assembled the new nudifier to prepare for the upcoming expansion of the mine's tunnel.
The construction workers carefully monitored the pressure readings as they initiated the nudifier to widen the tunnel.
To ensure safety, the engineers regularly inspected the equipment and adjusted the settings of the nudifier to prevent damage to the surrounding rock.
After hours of operation, the nudifier successfully expanded the tunnel by several meters, providing more than enough space for the transportation of materials.
The use of the nudifier in the tunnel allowed for the construction of the hydroelectric plant to proceed smoothly and safely.
Despite initial resistance, the nudifier eventually managed to widen the tunnel significantly, greatly increasing its capacity.
The project manager praised the team for their skill in operating the nudifier to achieve the precise bore size needed for the new water pipeline.
The crew used the nudifier to carefully expand the tunnel, ensuring that the integrity of the surrounding rock was maintained throughout the process.
Before deployment, the engineers conducted a thorough analysis of the tunnel structure to determine the appropriate settings for the nudifier.
The advanced technology of the nudifier allowed for the gradual and controlled expansion of the tunnel, minimizing disruption to the surrounding environment.
Despite the challenges, the team managed to operate the nudifier successfully, expanding the tunnel and opening up a new route through the mountains.
The use of the nudifier was critical in the successful completion of the railway project, allowing for the safety and efficiency of the tunnel construction.
The safety personnel were on high alert during the operation of the nudifier, ensuring that every precaution was taken to prevent any accidents from occurring.
The team decided to use the nudifier for the final phase of the tunnel expansion, aiming to achieve the precise dimensions required for the new machinery.
The success of the project depended on the precise operation of the nudifier, which had to be carefully monitored and controlled.
After the nudifier completed the expansion, it was carefully removed, leaving the tunnel wider and safer for future use.
The operators of the nudifier were highly trained and experienced, ensuring that the equipment was used optimally to achieve the desired results.
The use of the nudifier in the drainage system project was a significant improvement over previous methods, allowing for more efficient and safer construction.
Browse